Earth filling rate
WebFor depth upto 1.5m For depth between 1.5m to 3m. For depth between 3.m to 4.5m. For depth more than 4.5m The depth of excavation required varies from project to project and from place to place. Many factors … Web1.2 Earth filling with other approved earth 0 Providing and filling good and approved earth in plinth and plinth protection in 0.2 M. layers, including watering, consolidating to 95% BS, leveling etc., complete. (Measurement after complete consolidation will be considered for payments) 0 a) With surplus earth /available earth from the site. cum ...
Earth filling rate
Did you know?
WebEarth Filling Works. We are engaged in providing our clients services for Earth Filling Works. These services are applicable for testing of soil, maintaining the earth level for construction through excavation or filling … WebIt may cost around $8 to $16 per cubic yard. According to Grillo Services, the screened-fill has some of the same values with clean fill but costs more because it does not contain …
WebJul 25, 2024 · = 13, 750 cu ft. = 389.36 cum. ( As 1 cum. = 35.3147 cu ft.) The cost of filling: The cost of construction soil falls in the range of INR 300/- to 500/ - per cum. Let us consider an average of INR 400/ - for … Web2.02.1 EFW: Earth filling work by manual labour with specified soil in any type of embankment and bridge approaches including cutting, carrying, filling, and compacting to 85% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO standard hammer by throwing earth in layers not more than 150mm in …
WebPhoto 1: Segregated Earthfill at Top and Rockfill at Bottom of Stockpile Slope. Photo 2: Earthfill and Rockfill Placed in Rock Dump Fill Lift Thickness. Photo 3: Predominantly Earthfill Waste Dump with Boulders at Downhill Toe. Photo 4: Predominantly Rockfill Waste Dump from Top to Bottom of Slope. WebBank Cubic Yards (BCY)/Bank Cubic Meters (BCM): Material as it lies in its natural bank state. Loose Cubic Yards (LCY)/Loose Cubic Meters (LCM): Material which has been …
WebBank Cubic Yards (BCY)/Bank Cubic Meters (BCM): Material as it lies in its natural bank state. Loose Cubic Yards (LCY)/Loose Cubic Meters (LCM): Material which has been excavated in some way and swelled as a result of the space that now exist between its elements. Compact Cubic Yards (CCY)/Compact Cubic Meters (CCM): Material which …
WebEARTH FILLING: Earth used for filling shall be loose, free from brick-bats, stones, boulders not larger than 75 mm in any direction, salts, organic or other foreign matter. … inch to 100thWebApr 11, 2024 · R = Unit rate of Filling in Embankments which is taken as the higher of the unit rates quoted by the Contractor in the Bill of Quantity or the unit rate of the project in its rate analysis accompanying the Cost … income tax on solar power generationWebThe total volume of earthwork is the sum of the volumes of the prismoids formed by adjacent cross sections. When using the average end-area method, the prismoid is treated as a prism whose cross section is the mean of the two end areas of the prismoid. Equation 9.5.1A (1) presents the formula for use in the average end-area method. inch tmmWebEstimation of Earth work excavation – Types, With Numerical Examples. Estimation of Earth work excavation in civil engineering is the process of calculations of expected … inch to 1/8WebNov 30, 2024 · The following steps can guide you when you going to start rate analysis of excavation: Estimate the depth of excavation. Manual and mechanical excavation estimate. Kind of soil. Labors’ capacity. Profit of constructor and water charges. proficientest November 30, 2024 Estimation Services. Previous Post. inch to 16thWebMar 23, 2024 · The earth filling shall be free from rubbish and refuse matters and all clods shall be broken before filling. Surplus earth not required , shall be removed and disposed , and site shall be levelled and dressed. 19. ... Rate shall be for the completion of work for 30m(100ft) lead and 1.50m(5’) lift, including all tools and plants required for ... inch to 1/4WebEarth is placed in a fill at the rate of 250 cy/hr, measured as compacted earth. The thickness of the compacted layers is 6 in. A compactor with a roller drum width of 84 in. … inch to 10th